Showing posts with label trail. Show all posts
Showing posts with label trail. Show all posts

Sunday, June 9, 2024

Water is back in the canal

Top of Lock 22 (Pennyfield Lock)

In mid May I was at Great Falls along the C and O canal and noticed that the canal had been re-watered there.  I didn't know how far north they had put water back in the canal.

The canal hasn't had water in it for a few years. I actually don't remember the last time I saw it with more than a trickle of water.  The park service was replacing the locks and doing other canal maintenance all last year, I even posted about it once last year.  In 2018 and 2020 I posted about the canal at Great Falls tavern, but I think some parts of the canal to the north had water at the time.

The canal is at least mostly full between Great Falls and Lock 23 Violett's Lock. That is also the location of Inlet Lock 2, and the canal hasn't had water in it above that spot in my memory.  The water does look low, Above Swains lock it could use another foot or two of water. I'm not sure if it is still in the process of being filled or if this is the new normal.  Some spots, mostly where creeks flow into the canal are shallow enough that you can see the running water.

Islands of plants growing in the water of the canal.

Muskrat swimming in the canal

This is the first time I have ever seen a muskrat in the wild. They look alot like narrow-tailed beavers. This one totally ignored my while it swam, dove, and nibbled on grass.

 I'll also note that I drove on Canal Road on Sunday and the part of the canal near Georgetown still has no water in it.

 

 

 

Sunday, November 21, 2021

Fallen tree on Little Falls Trail

Another observation from my walk on Little Falls Trail yesterday. A long-dead tree fell and currently blocks Little Falls trail.  In the background you can see a car that is driving on Massachusetts Avenue.

You can see this is not the first time a tree has fallen down this hill and blocked the trail.  I wonder what is causing this.


 

Wednesday, May 26, 2021

Little Falls Trail almost back to normal

 

They have been working on replacing the bridges on Little Falls Trail in Bethesda, MD since last fall, but the end is in sight now.  The bridges themselves have been open for a while, although one of them still doesn't have a ramp up to it.  They are in the process (and have been for a couple of weeks) of removing the thick layer of mulch they put down over the trail to protect it.  The very end of the trail, near Albermarle Street still has a big pile of mulch and some heavy duty wood planks but the rest has been cleared.


The trail here used to have about a foot of wood mulch over it, all has been removed and the trail swept clean. There is still some construction equipment parked along the trail.


After the clean up, they relandscape the area. Relandscaping might be a strong word for what they are doing, but after carefully cleaning up all the mulch and clearing a couple of feet on each side of the trail, they are putting straw down over the bare dirt.  I suspect they put grass seed under the straw.

Not everything is complete, there are a couple of places where the trail has been torn up and needs to be replaced, primarily at Albermarle St, the ramp leading to one of the bridges, and the area where the rebuilt a drainage creek that goes under the trail.  After that, everything will be back to normal, but as of now, as long as you don't require handicap accessibility it is fully usable.

Friday, March 26, 2021

Little Falls Trail construction (update number 2)

 

Work continues on the bridges over Little Falls branch.  As you recall from last update the bridge closest to the Dalecarlia tunnel has been replaced and is open.

The bridge closer to Massachusetts Avenue  has been replaced, but there is still work to do before it can be opened.

The approach to the bridge on the opposite side of the creek from the Capital Crescent Trail (CCT) still needs to have the path created up to the bridge so there isn't a step.


The side closest to the Capital Crescent Trail has been graded so it smoothly transitions to the bridge.  However, there is still a bright orange fence blocking the trail so you can't access it from the CCT yet.


The Little Falls Trail still is being worked on.  Between the two bridges the trail is somewhat blocked (with a marked detour around it) and covered with a thick layer of mulch to protect the ground when heavy equipment is being used.
Near the bridge is a small drainage creek that is being widened and rebuilt.



Saturday, January 23, 2021

Little Falls Trail construction update

 

 


 The construction on Little Falls trail that started in September continues and significant progress has been made. One of the bridges has been fully replaced and re-opened for people to cross. This is bridge P17-01 near the Dalecarlia tunnel that connects a neighborhood to the Capital Crescent Trail.

The trail between the two bridges is closed, however there is a marked detour so you can still traverse the area, just not on a paved trail.

The other bridge has been fully removed and has not yet been replaced. You can not cross the stream here.





Wednesday, November 11, 2020

Construction closes a portion of the Little Falls trail

 

The Little Falls Trail bridge closest to the Dalecarlia tunnel has been closed for some planned improvements.  I posted about this construction back in September, and it has now started.  This bridge (P17-01) is being replaced, the trail in the area will be repaved, and there will be drainage improvements and stream channel stabilization.  More information is available on the county website.  



Wednesday, September 16, 2020

Construction on the Little Falls Trail


 Construction is starting on improvements to the Little Falls Stream Valley Park and the Little Falls hiker-biker paved trail.  The work is scheduled for late summer 2020 (ie, now) through Spring of 2021 and will close portions of the trail.


Two pedestrian bridges that connect the trail to the Capital Crescent Trail near Westmoreland hills and near the Dalecarlia tunnel will be replaced. (For those of you who have memorized every bridge in the area and the designations the Montgomery County Department of Parks has given them, they are bridges P17-01 and P17-02, there will be a quiz later.)  In addition to replacing the bridges, the trail in the area will be repaved, there will be drainage improvements and stream channel stabilization.

Footbridge P17-01 on the left.

Markers along the trail in preparation for the construction

P17-02 and Little Falls stream

More information is available on the county website.

And now for the promised quiz, there is just one question:

Who gives bridges names like P17-01 and P17-02?

Sunday, August 16, 2020

Go Visit: Harpers Ferry

 

Harpers Ferry lies at the confluence of the Potomac and Shenandoah rivers where Maryland, Virginia, and West Virginia meet. The town is in West Virginia and the lower part of the town is within the US Park Service run Harpers Ferry National Historic Park. 

 

You have probably heard of Harpers Ferry when you learned history in school.  It is the site of the abolitionist John Brown's raid on the US arsenal there. Brown attacked and captured several buildings; hoping to secure the weapons depot and arm the slaves, starting a revolt across the South. The raid ultimately failed when the US army sent an expedition commanded by Lieutenant Colonel Robert E. Lee (who would later become a general in the Confederate army) stormed the fire house where Brown and his men had taken refuge.

In addition to the downtown area, there are a number of hiking trails and beautiul sights to see.  There are two railroad bridges that cross the Potomac here as well as the piers of a couple of older bridges.  This one was built in 1894 and carries the CSX Shenandoah Subdivision line toward Winchester Virginia. The other bridge is just upstream was built in 1930 and caries the CSX Cumberland Subdivision line to Martinsburg, WV.

The bridge also carries the Appalachian Trail across the Potomac River.  This crossing was closed in late 2019 because of a train derailment, but the damage was fixed and the trail reopened in early July of this year.

A popular hike is to start in downtowm Harpers Ferry, cross the Potomac on the Appalachian Trail, travel north on the C & O canal a short distance, then take the Maryland Heights trail up to an overlook with a stunning view of Harpers Ferry and the rivers.

Here's the view of Harpers Ferry, the two railroad bridges, and the confluence of the Shenendoah River (top) and the Potomac River (bottom).  You can see piers from older bridges crossing the Potomac just to the left of the railroad bridges, and piers from a bridge that crossed the Shenandoah just before the confluence.


The C & O canal also runs along the Maryland side of the Potomac River.  The canal doesn't have water in it but the tow path is well maintained and is a popular place for hiking and biking. Here we are looking down at the bright ribbon of the C & O canal towpath and the Potomac River.  As seen from Maryland Heights, a large rock outcropping that overlooks Harpers Ferry, WV.

 Another hike you can do is to cross the Shenandoah River on the US Route 340 bridge (which is also used by the Appalachian Trail, so there is a separated walkway), follow the trail up the mountain then take a left on the Loudoun Heights overlook trail.  This takes you to an overlook where you can see Harpers Ferry from just below the confluence of the Shenandoah and Potomac rivers.


Wednesday, August 12, 2020

Go Visit: Seneca Creek Greenway Trail at River Road

 Last month, I explored the Seneca Creek Greenway Trail starting at Maryland Route 28 and going west towards the Potomac River.  Today I'm starting at the western end of the trail and going east, towards MD-28.

If you are a purist, you will want to start at the official beginning, at the ruins of Seneca Mill, or at Riley's Lock, where Seneca Creek flows in to the Potomac river.  In either case, the first mile is walking along a road.  Since I'm not a purist, and I don't enjoy walking along the side of roads, I started just across River Road, on Seneca Rd.  There is a wide shoulder there with enough parking for 3-4 cars.

This trail goes through varied terrain, sometimes heavily wooded, sometimes meadows, and everything in between.

If you aren't familiar with the Seneca Creek Greenway trail, it runs all the way from the Potomac River to Watkins Mill Road, a total of 24 miles.  North of Watkins Mill, it continues as the Lower Magruder Trail.


The first 1.3 miles connects Seneca Road to Berryville Road.  It is a hilly section of the trail with lots of ups and downs.  The trail is forested and shady.  There are a couple of small streams with wooden bridges over them.

Along the way I saw this old log with a mass of miniature mushrooms growing out of it. I was surprised both at how many there were and how small they are.  Other parts of the trail in this area have ferns growing right up to the trail's edge.

Towards the end, it can get confusing, what looks like a path that leads off to the left with access to the creek is really the main trail.  Go down the hill and cross the creek on stones.  If you get to a road (Berryville Rd), you've gone too far, but don't panic, just take a left and walk along the road until you see a parking area and the trail again.

At the parking area, the trail continues on, 4.4 miles to MD Route 28. This post won't cover the whole way, just to the Berryville Road Side Trail.


Seneca Creek is deep and wide here. Lots of families come to splash in the water and swim.  Shortly after this area the trail veers away from the creek and you won't see much of it again, so enjoy the water now.  From here on the trail is mostly flat with the occasional hill.

The trail has mile posts every half mile so you can keep track of your progress, it also has these blue posts with the trail name on it.  Even with that, it isn't all that well marked.  There are lots of side trails and it sometimes isn't clear which trail is the main trail. It would be nice if they had signs where trails met so you know which way to go.

There are a couple of places where you can see signs of the past.  Here is a couple of long refrigerator cases. I'm not sure how they got here, and they have obviously been here for a while, but out in the middle of the woods, just a little way off the main trail is this old refrigerator case from a grocery store.

A stretch of the trail goes through a meadow.  Here is near the start, as the trees give way to grass.

Another sign of the past.  In some places you can see remnants of fence from before this area was a park. Here, right by the path, are several strands of barbed wire coming out of a tree.

The trail crosses a number of small streams, many of them have bridges built over them.

One of the few marked side trails is this one, the sign says Berryville Road side trail, and it should take you back to Berryville Rd.  This is where I turned around.  If you want to see what there is if you continued, read my post on the trail starting at MD-28.  You can also learn more about Seneca Creek on Wikipedia.

Thursday, July 16, 2020

Go Visit: Seneca Creek Greenway Trail at MD-28


The Seneca Creek Greenway trail runs for 16.2 miles alongside Seneca Creek in Montgomery County, MD.  There are a number of places to access this trail and I went to the one on MD-28, Darnestown Rd.  I walked west, towards the Potomac River, which is a bit over 6 miles away.

The entrance to the parking lot is easy to miss. As you are going west on 28, it is on the right, just before the bridge over Seneca Creek.  It is a gravel parking lot that will fill up on weekends, but even when it is full, there aren't many people on the trail.  At the far end of the lot is an information sign and the entrance to the Seneca Creek Greenway trail towards the Potomac River.  At the other end of the lot is the trail going towards Black Rock Mill.

After a quick walk down a gravel path, then a little bit of old MD-28, the trail goes off to the left, under the bridge.

There are a number of places you can access the creek from the Seneca Creek Greenway trail.  Here there is a wide gravel bank alongside the water.

The trail is mostly flat, not a lot of hills so it is an easy and relaxing walk.  There are blue trail marker that say "Seneca Greenway Trail" so you don't need to worry about getting lost. The trail is natural surface and goes through a mix of grassy areas, older trees, and some young trees.

Saturday, October 26, 2019

Fall is here, enjoy it

 I went for a walk on Cabin John trail today, There may be rain in the forecast for tomorrow, but today was a perfect day to get outside and get some exercise.  The leaves on the tree are a wonderful mix of greens, yellows, and reds.