Thursday, May 14, 2009

A little work on the Trail


Today they were putting asphalt down on a small stretch of the Georgetown Branch trail, from the entrance at Elm Street Park to just outside the tunnel (going east) in Bethesda, MD. They also have recently paved the drainage ditch that runs alongside the trail. In the photo, you can see where the blacktop ends in the lower right corner. You can also see the wood plank across the ditch where you would access the trail from Pearl St. When I went by they had just finished the paving, the blacktop was still warm and they were still packing up.

Update 5/16: I went down the trail a ways to see how far the concrete drainage ditch goes. It continues until near the bridge at East-West Highway.

No comments:

Post a Comment