Sunday, July 9, 2023
Looking down on Great Falls
Wednesday, July 5, 2023
Bike parking at Grosvenor metro
There is a new chicken coop going in at the Grosvenor-Strathmore metro station. I think suburban farming is a great idea and look forward to being able to pick up a dozen fresh eggs on the way home from work.
Oh, maybe I got a few details wrong. They are putting in a Bike & Ride facility that will securely house 100 bikes. You'll be able to park your bike out of the rain and snow and have it locked up. There are currently bike racks which have a roof over them on site, but this will be more secure and more attractive.
In the tone of urban planning, this is the bikeshed, the view of the area around the bike shed (the building that will contain the bikes). Would it be bike shedding to ask what color it will be painted? (Ok, for you pedants out there, I know I am mis-defining this term multiple times, I find it amusing.)
This secure bike building includes a solid roof and wire mesh walls, as well as two doors. It still looks like a chicken coop to me.
Monday, July 3, 2023
Strathmore Square construction
Strathmore Square is a new development being built on the grounds of the Grosvenor-Strathmore WMATA Metro station in North Bethesda, Maryland. The vision is to have seven new buildings on just about every inch of open space except for a small "central park" area.
![]() |
| As seen from outside the parking garage |
The first two buildings are under construction now and planned for a 2024 delivery. Between them they will have 220 "luxurious" units. According to their website, "this unique development offers marketing word, marketing word, marketing word". Both buildings a visible in the above picture, the taller stack on the left is one of them and the longer (slightly shorter) stack on the right is the other.
![]() |
| The buildings from the bus bays |
Tuesday, June 13, 2023
Cutting down trees and digging up dirt in Amalyn
![]() |
| A trench for a fence |
Last week I saw them digging narrow trenches where they will be putting in a silt fence. They always do this shortly before construction starts, so that is the sign that they will be building here soon.
They are opening up a new area of the WMAL radio transmitter site for housing. Yesterday they were cutting down trees to clear the area. The heavy equipment they use makes quick work of it and they made it at least most of the way down the field. This is the part of the project that is closes to Interstate 495, from Renita Lane to Greentree Road.
Friday, June 9, 2023
8015 Old Georgetown Road construction update
It has been months since I last posted about the former Christ Lutheran Church site. They have been doing lots of work, but it hasn't been very visible. First, they dug a big hole, and then have been building up. They have finally reached ground level. The church is being replaced with about 297 apartments in a development called 8015 Old Georgetown Road. Above is the development as seen from Glenbrook Road.
After months spent excavating and building what will be underground, they have reached ground level and are starting to build up.
This is the north side of the 8015 site. To the left (not visible) is Bethesda-Chevy Chase Rescue Squad. There is a significant retaining wall buit here.
Thursday, June 8, 2023
The smell of smoke hangs in the air
![]() |
| Looking down Old Georgetown Road from Auburn Avenue. The buildings get progressively fainter the further away they are. June 6, 2023. |
This week has been hazy, and, this morning (and yesterday) I could smell smoke in the air. Smoke from wildfires in Canada has made its way to Bethesda, leaving us with a smokey haze, a less-than-totally-pleasant smell, and terrible air quality.
![]() |
| Free smoke on Woodmont: The Bethesda Circulator drives down Woodmont Avenue with the buildings shrouded in smoke, 2023-06-08. |
![]() |
| Old Georgetown Road at Greenwich Park looking north 2023-06-08. |
Tuesday, June 6, 2023
Bethesda parking garages will require payment on Saturdays
Starting July 8th, you will have to pay on Saturdays to park in the public parking garages in downtown Bethesda, MD. Prior to this you only had to pay Monday through Friday.
The rates are unchanged at $1.50 an hour between the hours of 7am and 10pm. Parking will remain free all day Sunday.
Monday, May 15, 2023
Amalyn housing development progress
It's time for another update on the Amalyn housing development in Bethesda. This is where the WMAL radio broadcast towers used to be. When completed there will be over 300 single family houses and townhouses in this 75 acre development. You can read all my posts on this subject.
Three houses in a row that are all at the same state of completion on Silver Linden St. near Derbyshire Ln.
Here's a row of townhouses that are just going up. Just the first story walls are up so far. Silver Linden St on the west side of the development. Silver Linden Street is currently the longest road in the development so a lot of construction is occurring on it.
Here's a row of nearly complete townhouses and behind them are completed townhomes. Photo taken from Silver Linden St, but the houses are on Viceroy Alley.
Sunday, May 7, 2023
Stratton Place luxury homes
There is going to be a bit more infill development here in Bethesda, and, no surprise, it will be luxury homes. This house will be demolished and a new road, Andrus Rd, will be built perpendicular to Greentree Rd with houses on the left side of it.
From the preliminary plan (pdf link) "proposes eight (8) new lots by subdividing the rear of seven (7) existing lots, for a total of 15 lots, on a total of 5.38 acres of land zoned R-90. Eight (8) houses will be new, six (6) will remain, and one (1) will be demolished and replaced."
Of note, this also excludes a portion of Site Area per Adverse Possession case and including a bit of additional Right-of-Way on Barnett Rd.
These houses will be in the Burning Tree Elementary School, Pyle Middle School, and Whitman High School districts.
Saturday, May 6, 2023
Construction on the C & O Canal near Great Falls
Right now there is an ongoing construction project on the C & O Canal just north of Great Falls Tavern, I don't think they will be working weekends, but during the week there could be an impact. I saw them working on Friday, but they were done for the day by 3:30.
They have built a gravel bridge across the canal to provide access to the towpath side, and in places, the towpath is a bit torn up from heavy equipment driving on it, but it is still easily passible.
![]() |
| Construction notice |
More information is on a sign at the construction site: "Contractors and the U.S. Army Corps of Engineers are working to remove sediment from select locations along the canal in the vicinity of Great Falla, resurfacing the towpath from Lock 21-23, and removal of debrise from the canal between Lock 20-23. During these projects, the towpath will intermittently be closed for up to 1-hour to facilitate construction access."

































